{"article":{"annotation":{"article_id":"cern-solar-electricity-program-two-plants-2026-11-11","available_at":"2026-11-11T23:00:11.500988Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"4b8351644c99f0ad82ca690c25b6f949926fb2908799dc2f38d30d6a12e2f0e5","input_sha256":"0c474f7042e2ea100f238238a2da1feeee88db1c9d7c44c0ee47fbdc09cc946e","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001209","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: solar","source_urls":["https://home.cern/integrating-renewable-solar-energy-to-cover-cerns-energy-needs-a-subtle-and-complex-balancing-act/","https://home.cern/cern-signs-long-term-solar-power-agreements/"]}],"method":"controlled-rules-v1","rule_id":"solar-power","status":"candidate"},{"concept_id":"medtop:20000260","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: electricity","source_urls":["https://home.cern/integrating-renewable-solar-energy-to-cover-cerns-energy-needs-a-subtle-and-complex-balancing-act/","https://home.cern/cern-signs-long-term-solar-power-agreements/"]}],"method":"controlled-rules-v1","rule_id":"electricity","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["CERN says two solar installations supplying electricity under long-term purchase agreements are operational, while a third and larger project is expected to begin operating in July 2027. In an update published on 11 November 2026, the European particle physics laboratory described how the projects are being integrated into its electricity procurement and why generation does not always coincide with demand.","The Terres Salées plant in southern France began supplying power in May 2026, followed by Séranon in June, according to CERN. The laboratory says the two installations together represent around 27% of the solar capacity planned under its three agreement programme. That is a share of planned capacity, not a measurement that 27% of CERN's electricity consumption now comes from solar energy.","The third installation, Roujanel in the Lozère department, is the largest of the three and is expected to operate from July 2027. That date is CERN's expectation, not a completed commissioning milestone. The earlier announcement in November 2024 described the three agreements together as providing a planned 95 megawatts of peak solar capacity and about 140 gigawatt hours per year over 15 years. Those were programme projections, not verified generation in 2026.","Peak capacity and annual energy measure different things. Megawatts describe a rate of power at a given moment, while gigawatt hours measure electricity over time. Solar output changes with sunlight and season, so a plant's capacity cannot be read as constant delivery throughout the day. The 27% capacity share cannot be directly converted into a percentage of annual consumption without information on output and demand.","CERN's November update leaves one percentage needing clarification. In a passage following discussion of the two operating plants, it says solar generation covers around 10% of annual electricity needs in a nominal physics operation year. Later, the same update says CERN will reach its approximately 10% annual objective once the third plant is online. Its 2024 announcement associated that objective with all three agreements. The November wording does not clearly establish whether the earlier reference describes the current pair or the completed programme, so the current share is not independently confirmed here.","The laboratory says a monitoring platform from Voltalia, its partner for the two operational contracts, provides production data in intervals of 10 minutes. Output generally rises during the morning, peaks around midday and falls toward sunset, with seasonal variation. CERN must forecast both its own needs and the solar output when determining what additional electricity to buy on the market.","During physics operations, CERN says solar generation is absorbed by its demand. During long accelerator shutdowns, consumption is lower and some generation can exceed the laboratory's needs. CERN says excess energy must be sold back to the market because it currently has no large-scale storage solution. The description concerns its procurement arrangements and does not mean solar panels alone provide uninterrupted power to the accelerator complex.","The November account identifies four roles in the arrangement: CERN as purchaser, a solar producer such as Voltalia, EDF as the current electricity supplier and Agregio as the current aggregator. The aggregator manages variability and supplies a more predictable profile to the supplier, CERN says. These are reported commercial roles, not a new construction contract award or a statement of how much each company has earned.","CERN said experience with the first operational agreements helped shape electricity procurement for 2027 and 2028, during the long shutdown. Its 2024 plan associated the combined programme with roughly a tenth of annual consumption in accelerator operation years. Actual coverage will depend on generation, consumption and the commissioning of the remaining plant, and the source's ambiguous current percentage needs clarification.","The verified November development is the laboratory's report on two operating plants and its expected timetable for the third. Energy output, installed capacity, an annual target and commissioning status should remain separate when assessing the programme."],"sections":[]},"corrections":[],"country":null,"data":{"blocks":[{"description":{"ar":"أعلن سيرن تشغيل محطتين وتوقع الثالثة في يوليو 2027.","de":"CERN meldet zwei laufende Anlagen und erwartet die dritte im Juli 2027.","en":"CERN reports two plants operating and expects the third in July 2027.","es":"El CERN informa de dos plantas operativas y espera la tercera en julio de 2027.","fr":"Le CERN indique que deux centrales fonctionnent et attend la troisième en juillet 2027.","pt":"O CERN informa duas usinas em operação e espera a terceira em julho de 2027.","tr":"CERN, iki tesisin çalıştığını ve üçüncüsünün Temmuz 2027’de beklendiğini bildirdi."},"id":"solar-program-update","items":[{"date":"2026-11-11","description":{"ar":"أعلن سيرن تشغيل محطتين وتوقع الثالثة في يوليو 2027.","de":"CERN meldet zwei laufende Anlagen und erwartet die dritte im Juli 2027.","en":"CERN reports two plants operating and expects the third in July 2027.","es":"El CERN informa de dos plantas operativas y espera la tercera en julio de 2027.","fr":"Le CERN indique que deux centrales fonctionnent et attend la troisième en juillet 2027.","pt":"O CERN informa duas usinas em operação e espera a terceira em julho de 2027.","tr":"CERN, iki tesisin çalıştığını ve üçüncüsünün Temmuz 2027’de beklendiğini bildirdi."},"label":{"ar":"سيرن يحدث معلومات برنامج الكهرباء الشمسية","de":"CERN aktualisiert Angaben zum Solarprogramm","en":"CERN updates its solar electricity programme","es":"El CERN actualiza su programa solar","fr":"Le CERN actualise son programme solaire","pt":"CERN atualiza informações do programa solar","tr":"CERN güneş enerjisi programını güncelledi"},"status":"occurred"}],"methodology":{"ar":"11 نوفمبر هو تاريخ تحديث سيرن ولا يعني اكتمال المحطة الثالثة.","de":"Der 11. November ist das Datum der Mitteilung und keine Inbetriebnahme der dritten Anlage.","en":"11 November is the date of CERN’s update; it does not mean the third plant is complete.","es":"El 11 de noviembre es la fecha de la actualización, no la puesta en servicio de la tercera planta.","fr":"Le 11 novembre est la date de l'actualisation, pas celle d'une mise en service de la troisième centrale.","pt":"11 de novembro é a data da atualização, não a entrada em operação da terceira usina.","tr":"11 Kasım, CERN güncellemesinin tarihidir; üçüncü tesisin henüz tamamlandığı anlamına gelmez."},"sourceUrls":["https://home.cern/integrating-renewable-solar-energy-to-cover-cerns-energy-needs-a-subtle-and-complex-balancing-act/"],"title":{"ar":"سيرن يحدث معلومات برنامج الكهرباء الشمسية","de":"CERN aktualisiert Angaben zum Solarprogramm","en":"CERN updates its solar electricity programme","es":"El CERN actualiza su programa solar","fr":"Le CERN actualise son programme solaire","pt":"CERN atualiza informações do programa solar","tr":"CERN güneş enerjisi programını güncelledi"},"type":"events","updatedAt":"2026-11-11T22:57:57+00:00"},{"description":{"ar":"حصة تقريبية من القدرة حسب سيرن، وليست حصة الاستهلاك أو كمية إنتاج فعلية.","de":"Ungefährer Leistungsanteil laut CERN, kein Anteil am Verbrauch und keine beobachtete Energiemenge.","en":"CERN’s approximate capacity share, not a share of electricity consumption or observed energy output.","es":"Cuota aproximada de capacidad según el CERN, no cuota del consumo ni energía generada observada.","fr":"Part approximative de la capacité selon le CERN, non part de consommation ni énergie produite observée.","pt":"Parcela aproximada de capacidade segundo o CERN, não participação no consumo nem energia efetivamente produzida.","tr":"CERN’in yaklaşık kapasite payı; elektrik tüketimindeki pay veya gerçekleşen enerji miktarı değildir."},"id":"operational-capacity-share","items":[{"basis":"estimate","label":{"ar":"حصة المحطتين العاملتين من القدرة المخططة للمشاريع الثلاثة","de":"Anteil der zwei laufenden Anlagen an der geplanten Leistung der drei Projekte","en":"Operating pair share of planned three-project capacity","es":"Cuota de las dos plantas operativas en la capacidad prevista de los tres proyectos","fr":"Part des deux centrales actives dans la capacité prévue des trois projets","pt":"Parcela das duas usinas em operação na capacidade prevista dos três projetos","tr":"İki çalışan tesisin üç projelik programın öngörülen kapasitesindeki payı"},"measure":{"aggregation":"rate","frequency":"irregular","geography":"france","id":"cern-two-operating-plants-share-of-three-planned-solar-capacity","periodRole":"announcement-date","unitCode":"percent"},"period":"2026-11-11","unit":"percent","value":27,"valueQualifier":"approximate"}],"methodology":{"ar":"حصة تقريبية من القدرة حسب سيرن، وليست حصة الاستهلاك أو كمية إنتاج فعلية.","de":"Ungefährer Leistungsanteil laut CERN, kein Anteil am Verbrauch und keine beobachtete Energiemenge.","en":"CERN’s approximate capacity share, not a share of electricity consumption or observed energy output.","es":"Cuota aproximada de capacidad según el CERN, no cuota del consumo ni energía generada observada.","fr":"Part approximative de la capacité selon le CERN, non part de consommation ni énergie produite observée.","pt":"Parcela aproximada de capacidade segundo o CERN, não participação no consumo nem energia efetivamente produzida.","tr":"CERN’in yaklaşık kapasite payı; elektrik tüketimindeki pay veya gerçekleşen enerji miktarı değildir."},"sourceUrls":["https://home.cern/integrating-renewable-solar-energy-to-cover-cerns-energy-needs-a-subtle-and-complex-balancing-act/"],"title":{"ar":"حصة المحطتين العاملتين من القدرة المخططة للمشاريع الثلاثة","de":"Anteil der zwei laufenden Anlagen an der geplanten Leistung der drei Projekte","en":"Operating pair share of planned three-project capacity","es":"Cuota de las dos plantas operativas en la capacidad prevista de los tres proyectos","fr":"Part des deux centrales actives dans la capacité prévue des trois projets","pt":"Parcela das duas usinas em operação na capacidade prevista dos três projetos","tr":"İki çalışan tesisin üç projelik programın öngörülen kapasitesindeki payı"},"type":"metrics","updatedAt":"2026-11-11T22:57:57+00:00"},{"description":{"ar":"خطة إعلان 29 نوفمبر 2024 وليست القدرة الحالية المركبة أو إنتاج 2026.","de":"Plan aus der Ankündigung vom 29. November 2024, keine aktuelle installierte Leistung oder Erzeugung von 2026.","en":"Plan in the 29 November 2024 announcement; not interpreted as current installed capacity or 2026 generation.","es":"Plan anunciado el 29 de noviembre de 2024, no capacidad instalada actual ni generación de 2026.","fr":"Plan de l'annonce du 29 novembre 2024, non capacité actuelle installée ni production de 2026.","pt":"Plano anunciado em 29 de novembro de 2024, não capacidade instalada atual nem geração de 2026.","tr":"29 Kasım 2024 tarihli açıklamadaki plan; güncel kurulu kapasite veya 2026 üretimi olarak yorumlanmaz."},"id":"solar-capacity-2024-plan","items":[{"basis":"forecast","label":{"ar":"القدرة القصوى المخططة للمشاريع الثلاثة في إعلان 2024","de":"Geplante gesamte Spitzenleistung der drei Projekte laut Ankündigung von 2024","en":"Total planned peak capacity of the three projects in the 2024 announcement","es":"Potencia pico total prevista para los tres proyectos en el anuncio de 2024","fr":"Puissance crête totale prévue des trois projets dans l’annonce de 2024","pt":"Potência de pico total prevista dos três projetos no anúncio de 2024","tr":"2024 duyurusundaki üç projenin planlanan toplam tepe gücü"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"france","id":"cern-three-solar-projects-2024-planned-peak-capacity","periodRole":"announcement-date","unitCode":"mw"},"period":"2024-11-29","unit":"MW","value":95}],"methodology":{"ar":"خطة إعلان 29 نوفمبر 2024 وليست القدرة الحالية المركبة أو إنتاج 2026.","de":"Plan aus der Ankündigung vom 29. November 2024, keine aktuelle installierte Leistung oder Erzeugung von 2026.","en":"Plan in the 29 November 2024 announcement; not interpreted as current installed capacity or 2026 generation.","es":"Plan anunciado el 29 de noviembre de 2024, no capacidad instalada actual ni generación de 2026.","fr":"Plan de l'annonce du 29 novembre 2024, non capacité actuelle installée ni production de 2026.","pt":"Plano anunciado em 29 de novembro de 2024, não capacidade instalada atual nem geração de 2026.","tr":"29 Kasım 2024 tarihli açıklamadaki plan; güncel kurulu kapasite veya 2026 üretimi olarak yorumlanmaz."},"sourceUrls":["https://home.cern/cern-signs-long-term-solar-power-agreements/"],"title":{"ar":"القدرة القصوى المخططة للمشاريع الثلاثة في إعلان 2024","de":"Geplante gesamte Spitzenleistung der drei Projekte laut Ankündigung von 2024","en":"Total planned peak capacity of the three projects in the 2024 announcement","es":"Potencia pico total prevista para los tres proyectos en el anuncio de 2024","fr":"Puissance crête totale prévue des trois projets dans l’annonce de 2024","pt":"Potência de pico total prevista dos três projetos no anúncio de 2024","tr":"2024 duyurusundaki üç projenin planlanan toplam tepe gücü"},"type":"metrics","updatedAt":"2026-11-11T22:57:57+00:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11/data/solar-program-update?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11/data/solar-program-update?lang=en&format=json"},"id":"solar-program-update"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11/data/operational-capacity-share?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11/data/operational-capacity-share?lang=en&format=json"},"id":"operational-capacity-share"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11/data/solar-capacity-2024-plan?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11/data/solar-capacity-2024-plan?lang=en&format=json"},"id":"solar-capacity-2024-plan"}],"data_types":["events","metrics"],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-111bda8f-12f0-5174-802b-69c367a56b68","event_period":"2026-11-11","event_period_basis":"event-or-reference-period","id":"cern-solar-electricity-program-two-plants-2026-11-11","image":null,"importance":0.6,"language":"en","modified_at":"2026-11-11T23:00:11+00:00","publication_basis":"publication-record","published_at":"2026-11-11T23:00:11+00:00","reading_minutes":4,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"cern-solar-electricity-program-two-plants-2026-11-11","sources":[{"checkedAt":"2026-11-12","name":"CERN: integrating renewable solar energy","publishedAt":"2026-11-11","url":"https://home.cern/integrating-renewable-solar-energy-to-cover-cerns-energy-needs-a-subtle-and-complex-balancing-act/"},{"checkedAt":"2026-11-12","name":"CERN: long-term solar power agreements","publishedAt":"2024-11-29","url":"https://home.cern/cern-signs-long-term-solar-power-agreements/"}],"summary":"The two plants represent about 27% of planned solar capacity. Wording about a 10% share of electricity needs requires clarification.","text":"The two plants represent about 27% of planned solar capacity. Wording about a 10% share of electricity needs requires clarification.\n\nCERN says two solar installations supplying electricity under long-term purchase agreements are operational, while a third and larger project is expected to begin operating in July 2027. In an update published on 11 November 2026, the European particle physics laboratory described how the projects are being integrated into its electricity procurement and why generation does not always coincide with demand.\n\nThe Terres Salées plant in southern France began supplying power in May 2026, followed by Séranon in June, according to CERN. The laboratory says the two installations together represent around 27% of the solar capacity planned under its three agreement programme. That is a share of planned capacity, not a measurement that 27% of CERN's electricity consumption now comes from solar energy.\n\nThe third installation, Roujanel in the Lozère department, is the largest of the three and is expected to operate from July 2027. That date is CERN's expectation, not a completed commissioning milestone. The earlier announcement in November 2024 described the three agreements together as providing a planned 95 megawatts of peak solar capacity and about 140 gigawatt hours per year over 15 years. Those were programme projections, not verified generation in 2026.\n\nPeak capacity and annual energy measure different things. Megawatts describe a rate of power at a given moment, while gigawatt hours measure electricity over time. Solar output changes with sunlight and season, so a plant's capacity cannot be read as constant delivery throughout the day. The 27% capacity share cannot be directly converted into a percentage of annual consumption without information on output and demand.\n\nCERN's November update leaves one percentage needing clarification. In a passage following discussion of the two operating plants, it says solar generation covers around 10% of annual electricity needs in a nominal physics operation year. Later, the same update says CERN will reach its approximately 10% annual objective once the third plant is online. Its 2024 announcement associated that objective with all three agreements. The November wording does not clearly establish whether the earlier reference describes the current pair or the completed programme, so the current share is not independently confirmed here.\n\nThe laboratory says a monitoring platform from Voltalia, its partner for the two operational contracts, provides production data in intervals of 10 minutes. Output generally rises during the morning, peaks around midday and falls toward sunset, with seasonal variation. CERN must forecast both its own needs and the solar output when determining what additional electricity to buy on the market.\n\nDuring physics operations, CERN says solar generation is absorbed by its demand. During long accelerator shutdowns, consumption is lower and some generation can exceed the laboratory's needs. CERN says excess energy must be sold back to the market because it currently has no large-scale storage solution. The description concerns its procurement arrangements and does not mean solar panels alone provide uninterrupted power to the accelerator complex.\n\nThe November account identifies four roles in the arrangement: CERN as purchaser, a solar producer such as Voltalia, EDF as the current electricity supplier and Agregio as the current aggregator. The aggregator manages variability and supplies a more predictable profile to the supplier, CERN says. These are reported commercial roles, not a new construction contract award or a statement of how much each company has earned.\n\nCERN said experience with the first operational agreements helped shape electricity procurement for 2027 and 2028, during the long shutdown. Its 2024 plan associated the combined programme with roughly a tenth of annual consumption in accelerator operation years. Actual coverage will depend on generation, consumption and the commissioning of the remaining plant, and the source's ambiguous current percentage needs clarification.\n\nThe verified November development is the laboratory's report on two operating plants and its expected timetable for the third. Energy output, installed capacity, an annual target and commissioning status should remain separate when assessing the programme.","title":"CERN reports two solar plants operating and expects a third in 2027","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/cern-solar-electricity-program-two-plants-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11?lang=en","language":"en","url":"https://newsverum.com/en/news/cern-solar-electricity-program-two-plants-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/cern-solar-electricity-program-two-plants-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/cern-solar-electricity-program-two-plants-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11?lang=es","language":"es","url":"https://newsverum.com/es/news/cern-solar-electricity-program-two-plants-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11?lang=de","language":"de","url":"https://newsverum.com/de/news/cern-solar-electricity-program-two-plants-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/cern-solar-electricity-program-two-plants-2026-11-11?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/cern-solar-electricity-program-two-plants-2026-11-11"}],"url":"https://newsverum.com/en/news/cern-solar-electricity-program-two-plants-2026-11-11"},"version":"1"}
