{"article":{"annotation":{"article_id":"bradda-head-whistlejacket-lithium-drilling-and-sampling","available_at":"2026-10-21T10:31:38.513881Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"1d6429ed4854aeaf2e9ea40247eaf3c2bbc2c663423448178ca132c4971b9009","input_sha256":"4aea44c2a3f484d721d7d980b3ebfefaa6801efc1c9fc819c3cc2c2e5844d279","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"US","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.investegate.co.uk/announcement/rns/bradda-head-lithium-limited-npv-di---bhl/unaudited-interim-results/9832837"]}],"geometry":null,"id":"iso3166-1:US","kind":"country-or-area","labels":{"ar":"الولايات المتحدة الأمريكية","en":"United States of America","es":"Estados Unidos de América","fr":"États-Unis d’Amérique"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000349","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.investegate.co.uk/announcement/rns/bradda-head-lithium-limited-npv-di---bhl/unaudited-interim-results/9832837"]}],"method":"controlled-rules-v1","rule_id":"business-broad","status":"candidate"},{"concept_id":"medtop:20001243","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: drilling programme","source_urls":["https://www.investegate.co.uk/announcement/rns/bradda-head-lithium-limited-npv-di---bhl/unaudited-interim-results/9832837"]}],"method":"controlled-rules-v1","rule_id":"oil-gas","status":"candidate"},{"concept_id":"medtop:20000316","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: lithium project","source_urls":["https://www.investegate.co.uk/announcement/rns/bradda-head-lithium-limited-npv-di---bhl/unaudited-interim-results/9832837"]}],"method":"controlled-rules-v1","rule_id":"mining","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling?lang=fr","category":"business","content":{"key_points":[],"paragraphs":["Bradda Head Lithium a indiqué avoir commencé la phase 3 des forages sur son projet Whistlejacket en Arizona, son premier programme de forage sur ce site, dans des résultats intermédiaires publiés le 21 octobre.","La société a indiqué que son échantillonnage de surface en trois phases avait recueilli 303 échantillons de roche, avec une teneur maximale annoncée de 4,24 % Li₂O. Ces échantillons de surface ne sont ni des résultats de forage ni une estimation de ressource minérale."],"sections":[]},"corrections":[],"country":"US","data":{"blocks":[{"columns":[{"key":"metric","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Medición","fr":"Mesure","pt":"Indicador","tr":"Ölçüm"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"count"}],"description":{"ar":"بيان للفترة من الشركة؛ الأهداف ليست نتائج محققة.","de":"Vom Unternehmen gemeldeter Periodenwert; Ziele sind keine realisierten Ergebnisse.","en":"Company-reported period figure; targets are not realized results.","es":"Dato del periodo comunicado por la empresa; los objetivos no son resultados realizados.","fr":"Donnée de période publiée par l’entreprise ; les objectifs ne sont pas des résultats réalisés.","pt":"Dado do período informado pela empresa; metas não são resultados realizados.","tr":"Kaynağın dönem verisi; hedefler gerçekleşmiş sonuç değildir."},"id":"company-reported-figure","methodology":{"ar":"نُقلت القيمة والفترة من مصدر الشركة.","de":"Wert und Zeitraum aus der Unternehmensquelle übernommen.","en":"Value and period transcribed from the company source.","es":"Valor y periodo tomados de la fuente empresarial.","fr":"Valeur et période reprises de la source de l’entreprise.","pt":"Valor e período transcritos da fonte empresarial.","tr":"Değer ve dönem şirket kaynağından alınmıştır."},"rowTranslations":[{"metric":{"ar":"عينات رقائق الصخور في ويستلجاكيت","de":"Gesteinssplitterproben aus Whistlejacket","en":"Whistlejacket rock-chip samples","es":"Muestras de fragmentos de roca de Whistlejacket","fr":"Échantillons de fragments rocheux de Whistlejacket","pt":"Amostras de fragmentos de rocha de Whistlejacket","tr":"Whistlejacket kaya yongası örnekleri"}}],"rows":[{"metric":"Whistlejacket rock-chip samples","value":303}],"sourceUrls":["https://www.investegate.co.uk/announcement/rns/bradda-head-lithium-limited-npv-di---bhl/unaudited-interim-results/9832837"],"title":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Medición","fr":"Mesure","pt":"Indicador","tr":"Ölçüm"},"type":"table","updatedAt":"2026-10-21T10:03:09Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling/data/company-reported-figure?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling/data/company-reported-figure?lang=fr&format=json"},"id":"company-reported-figure"}],"data_types":["table"],"editorial_illustration":{"alt":"Illustration conceptuelle de l’industrie, de l’ingénierie et des réseaux logistiques.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"event_id":"event-649a64b9-a568-5ca5-a2b2-7628b860da54","event_period":"2026-10-21","event_period_basis":"event-or-reference-period","id":"bradda-head-whistlejacket-lithium-drilling-and-sampling","image":null,"importance":0.6,"language":"fr","modified_at":"2026-10-21T10:31:31+00:00","publication_basis":"publication-record","published_at":"2026-10-21T10:31:31+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Illustration conceptuelle de l’industrie, de l’ingénierie et des réseaux logistiques.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"slug":"bradda-head-whistlejacket-lithium-drilling-and-sampling","sources":[{"checkedAt":"2026-10-21","name":"Bradda Head Lithium Ltd (release via RNS)","publishedAt":"2026-10-21","url":"https://www.investegate.co.uk/announcement/rns/bradda-head-lithium-limited-npv-di---bhl/unaudited-interim-results/9832837"}],"summary":"Bradda Head a annoncé le 21 octobre le début de son premier programme de forage sur le projet Whistlejacket en Arizona.","text":"Bradda Head a annoncé le 21 octobre le début de son premier programme de forage sur le projet Whistlejacket en Arizona.\n\nBradda Head Lithium a indiqué avoir commencé la phase 3 des forages sur son projet Whistlejacket en Arizona, son premier programme de forage sur ce site, dans des résultats intermédiaires publiés le 21 octobre.\n\nLa société a indiqué que son échantillonnage de surface en trois phases avait recueilli 303 échantillons de roche, avec une teneur maximale annoncée de 4,24 % Li₂O. Ces échantillons de surface ne sont ni des résultats de forage ni une estimation de ressource minérale.","title":"Bradda Head lance des forages sur son projet de lithium en Arizona après 303 échantillons","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/bradda-head-whistlejacket-lithium-drilling-and-sampling"},{"api_url":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling?lang=en","language":"en","url":"https://newsverum.com/en/news/bradda-head-whistlejacket-lithium-drilling-and-sampling"},{"api_url":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/bradda-head-whistlejacket-lithium-drilling-and-sampling"},{"api_url":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/bradda-head-whistlejacket-lithium-drilling-and-sampling"},{"api_url":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling?lang=es","language":"es","url":"https://newsverum.com/es/news/bradda-head-whistlejacket-lithium-drilling-and-sampling"},{"api_url":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling?lang=de","language":"de","url":"https://newsverum.com/de/news/bradda-head-whistlejacket-lithium-drilling-and-sampling"},{"api_url":"https://newsverum.com/api/v1/articles/bradda-head-whistlejacket-lithium-drilling-and-sampling?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/bradda-head-whistlejacket-lithium-drilling-and-sampling"}],"url":"https://newsverum.com/fr/news/bradda-head-whistlejacket-lithium-drilling-and-sampling"},"version":"1"}
