{"article":{"annotation":{"article_id":"baluma-solar-granada-modification-environmental-screening","available_at":"2026-10-20T23:01:53.433178Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"86877150ea9bd4a7574c3041f1b5aa5cad4d23e150b23f2bf42dd03e6a277ccc","input_sha256":"71dd519c0f303717d693aab37183a0fabeb65806bda9ac22c89bb7ca948b878a","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"ES","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"geometry":null,"id":"iso3166-1:ES","kind":"country-or-area","labels":{"ar":"إسبانيا","en":"Spain","es":"España","fr":"Espagne"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001209","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: Solar","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"method":"controlled-rules-v1","rule_id":"solar-power","status":"candidate"},{"concept_id":"medtop:06000000","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"method":"controlled-rules-v1","rule_id":"environment-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=tr","category":"environment","content":{"key_points":[],"paragraphs":["Karar; Cubillas Nehri yakınında 220 kV tahliye hattının bir bölümünün yer altına alınmasını kapsıyor. Hat değişikliğinin seçilen güzergâhı yaklaşık 1.152 metre.","Muafiyet, mevcut çevresel izin ve kararda belirtilen koruma tedbirlerine uyulması şartına bağlıdır; yeni bir inşaat veya işletmeye alma bildirimi değildir."],"sections":[]},"corrections":[],"country":"ES","data":{"blocks":[{"columns":[{"key":"indicator","label":{"ar":"المؤشر","de":"Kennzahl","en":"Indicator","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"ميغاواط","de":"MW","en":"MW","es":"MW","fr":"MW","pt":"MW","tr":"Megavat"},"type":"number","unit":"MW"}],"description":{"ar":"بيانات المشروع الواردة في المصدر الرسمي.","de":"Projektangabe aus der amtlichen Quelle.","en":"Project information stated in the official source.","es":"Dato del proyecto indicado en la fuente oficial.","fr":"Donnée du projet indiquée dans la source officielle.","pt":"Dado do projeto indicado na fonte oficial.","tr":"Resmî kaynakta açıklanan proje verisi."},"id":"release-statistic","methodology":{"ar":"نقلت القيمة كما وردت في القرار؛ ولا تعني إنجاز المشروع أو تشغيله.","de":"Wert aus der Quelle; er bedeutet weder Fertigstellung noch Inbetriebnahme.","en":"The source states 58.14 MW as the installation’s capacity; this is not additional capacity created by the modification.","es":"Valor transcrito de la fuente; no significa que el proyecto esté terminado o en servicio.","fr":"Valeur reprise de la source; elle ne signifie ni achèvement ni mise en service.","pt":"Valor transcrito da fonte; não significa conclusão ou entrada em serviço.","tr":"Kaynakta Baluma Solar tesisinin beyan edilen kurulu gücü 58,14 MW’tır; değişiklikle eklenen yeni güç değildir."},"rowTranslations":[{"indicator":{"ar":"القدرة المركبة الاسمية","de":"Installierte Nennleistung","en":"Kurulu güç","es":"Potencia instalada nominal","fr":"Puissance installée nominale","pt":"Potência instalada nominal","tr":"Kurulu güç"}}],"rows":[{"indicator":"Kurulu güç","value":58.14}],"sourceUrls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"],"title":{"ar":"المصدر والمقياس","de":"Quelle und Messgröße","en":"Source and measure","es":"Fuente y medida","fr":"Source et mesure","pt":"Fonte e medida","tr":"Veri kaynağı ve ölçüm"},"type":"table","updatedAt":"2026-10-20T22:33:06Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening/data/release-statistic?lang=tr&format=csv","json":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening/data/release-statistic?lang=tr&format=json"},"id":"release-statistic"}],"data_types":["table"],"editorial_illustration":null,"event_id":"event-a73d8554-3177-557f-9e5c-1ed77b768d68","event_period":"2026-09-21","event_period_basis":"event-or-reference-period","id":"baluma-solar-granada-modification-environmental-screening","image":null,"importance":0.6,"language":"tr","modified_at":"2026-10-20T23:01:22+00:00","publication_basis":"publication-record","published_at":"2026-10-20T23:01:22+00:00","reading_minutes":1,"region":"world","section_illustration":null,"slug":"baluma-solar-granada-modification-environmental-screening","sources":[{"checkedAt":"2026-10-21","name":"Boletín Oficial del Estado (BOE)","publishedAt":"2026-10-17","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"}],"summary":"Çevresel kalite ve değerlendirme genel müdürlüğü, Granada’daki 58,14 MW Baluma Solar tesisindeki değişiklikleri olağan çevresel etki değerlendirmesine tabi tutmadı. Karar 17 Ekim’de BOE’de yayımlandı.","text":"Çevresel kalite ve değerlendirme genel müdürlüğü, Granada’daki 58,14 MW Baluma Solar tesisindeki değişiklikleri olağan çevresel etki değerlendirmesine tabi tutmadı. Karar 17 Ekim’de BOE’de yayımlandı.\n\nKarar; Cubillas Nehri yakınında 220 kV tahliye hattının bir bölümünün yer altına alınmasını kapsıyor. Hat değişikliğinin seçilen güzergâhı yaklaşık 1.152 metre.\n\nMuafiyet, mevcut çevresel izin ve kararda belirtilen koruma tedbirlerine uyulması şartına bağlıdır; yeni bir inşaat veya işletmeye alma bildirimi değildir.","title":"Baluma Solar değişikliği olağan çevresel etki değerlendirmesine alınmadı","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=en","language":"en","url":"https://newsverum.com/en/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=es","language":"es","url":"https://newsverum.com/es/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=de","language":"de","url":"https://newsverum.com/de/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/baluma-solar-granada-modification-environmental-screening"}],"url":"https://newsverum.com/tr/news/baluma-solar-granada-modification-environmental-screening"},"version":"1"}
