{"article":{"annotation":{"article_id":"baluma-solar-granada-modification-environmental-screening","available_at":"2026-10-20T23:01:53.433178Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"86877150ea9bd4a7574c3041f1b5aa5cad4d23e150b23f2bf42dd03e6a277ccc","input_sha256":"71dd519c0f303717d693aab37183a0fabeb65806bda9ac22c89bb7ca948b878a","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"ES","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"geometry":null,"id":"iso3166-1:ES","kind":"country-or-area","labels":{"ar":"إسبانيا","en":"Spain","es":"España","fr":"Espagne"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001209","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: Solar","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"method":"controlled-rules-v1","rule_id":"solar-power","status":"candidate"},{"concept_id":"medtop:06000000","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"method":"controlled-rules-v1","rule_id":"environment-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=es","category":"environment","content":{"key_points":[],"paragraphs":["El proyecto modifica parte de la línea de evacuación de 220 kV y prevé soterrar un tramo próximo al río Cubillas. El trazado elegido mide unos 1.152 metros.","La conclusión queda condicionada al cumplimiento de las medidas ambientales del proyecto original y de las prescripciones adicionales; no anuncia obras terminadas ni puesta en servicio."],"sections":[]},"corrections":[],"country":"ES","data":{"blocks":[{"columns":[{"key":"indicator","label":{"ar":"المؤشر","de":"Kennzahl","en":"Indicator","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"ميغاواط","de":"MW","en":"MW","es":"MW","fr":"MW","pt":"MW","tr":"Megavat"},"type":"number","unit":"MW"}],"description":{"ar":"بيانات المشروع الواردة في المصدر الرسمي.","de":"Projektangabe aus der amtlichen Quelle.","en":"Project information stated in the official source.","es":"Dato del proyecto indicado en la fuente oficial.","fr":"Donnée du projet indiquée dans la source officielle.","pt":"Dado do projeto indicado na fonte oficial.","tr":"Resmî kaynakta açıklanan proje verisi."},"id":"release-statistic","methodology":{"ar":"نقلت القيمة كما وردت في القرار؛ ولا تعني إنجاز المشروع أو تشغيله.","de":"Wert aus der Quelle; er bedeutet weder Fertigstellung noch Inbetriebnahme.","en":"The source states 58.14 MW as the installation’s capacity; this is not additional capacity created by the modification.","es":"Valor transcrito de la fuente; no significa que el proyecto esté terminado o en servicio.","fr":"Valeur reprise de la source; elle ne signifie ni achèvement ni mise en service.","pt":"Valor transcrito da fonte; não significa conclusão ou entrada em serviço.","tr":"Kaynakta Baluma Solar tesisinin beyan edilen kurulu gücü 58,14 MW’tır; değişiklikle eklenen yeni güç değildir."},"rowTranslations":[{"indicator":{"ar":"القدرة المركبة الاسمية","de":"Installierte Nennleistung","en":"Kurulu güç","es":"Potencia instalada nominal","fr":"Puissance installée nominale","pt":"Potência instalada nominal","tr":"Kurulu güç"}}],"rows":[{"indicator":"Kurulu güç","value":58.14}],"sourceUrls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"],"title":{"ar":"المصدر والمقياس","de":"Quelle und Messgröße","en":"Source and measure","es":"Fuente y medida","fr":"Source et mesure","pt":"Fonte e medida","tr":"Veri kaynağı ve ölçüm"},"type":"table","updatedAt":"2026-10-20T22:33:06Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening/data/release-statistic?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening/data/release-statistic?lang=es&format=json"},"id":"release-statistic"}],"data_types":["table"],"editorial_illustration":null,"event_id":"event-a73d8554-3177-557f-9e5c-1ed77b768d68","event_period":"2026-09-21","event_period_basis":"event-or-reference-period","id":"baluma-solar-granada-modification-environmental-screening","image":null,"importance":0.6,"language":"es","modified_at":"2026-10-20T23:01:22+00:00","publication_basis":"publication-record","published_at":"2026-10-20T23:01:22+00:00","reading_minutes":1,"region":"world","section_illustration":null,"slug":"baluma-solar-granada-modification-environmental-screening","sources":[{"checkedAt":"2026-10-21","name":"Boletín Oficial del Estado (BOE)","publishedAt":"2026-10-17","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"}],"summary":"La autoridad ambiental concluyó que las modificaciones de la instalación Baluma Solar, de 58,14 MW, en Granada, no requieren evaluación de impacto ambiental ordinaria. La resolución se publicó en el BOE el 17 de octubre.","text":"La autoridad ambiental concluyó que las modificaciones de la instalación Baluma Solar, de 58,14 MW, en Granada, no requieren evaluación de impacto ambiental ordinaria. La resolución se publicó en el BOE el 17 de octubre.\n\nEl proyecto modifica parte de la línea de evacuación de 220 kV y prevé soterrar un tramo próximo al río Cubillas. El trazado elegido mide unos 1.152 metros.\n\nLa conclusión queda condicionada al cumplimiento de las medidas ambientales del proyecto original y de las prescripciones adicionales; no anuncia obras terminadas ni puesta en servicio.","title":"La modificación de Baluma Solar queda exenta de evaluación ambiental ordinaria","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=en","language":"en","url":"https://newsverum.com/en/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=es","language":"es","url":"https://newsverum.com/es/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=de","language":"de","url":"https://newsverum.com/de/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/baluma-solar-granada-modification-environmental-screening"}],"url":"https://newsverum.com/es/news/baluma-solar-granada-modification-environmental-screening"},"version":"1"}
