{"article":{"annotation":{"article_id":"baluma-solar-granada-modification-environmental-screening","available_at":"2026-10-20T23:01:53.433178Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"86877150ea9bd4a7574c3041f1b5aa5cad4d23e150b23f2bf42dd03e6a277ccc","input_sha256":"71dd519c0f303717d693aab37183a0fabeb65806bda9ac22c89bb7ca948b878a","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"ES","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"geometry":null,"id":"iso3166-1:ES","kind":"country-or-area","labels":{"ar":"إسبانيا","en":"Spain","es":"España","fr":"Espagne"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001209","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: Solar","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"method":"controlled-rules-v1","rule_id":"solar-power","status":"candidate"},{"concept_id":"medtop:06000000","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"]}],"method":"controlled-rules-v1","rule_id":"environment-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=en","category":"environment","content":{"key_points":[],"paragraphs":["The change includes burying part of the 220 kV evacuation line near the Cubillas River. The selected route is about 1,152 metres long.","The screening outcome depends on compliance with the original project conditions and additional safeguards; it does not announce new construction or commissioning."],"sections":[]},"corrections":[],"country":"ES","data":{"blocks":[{"columns":[{"key":"indicator","label":{"ar":"المؤشر","de":"Kennzahl","en":"Indicator","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"ميغاواط","de":"MW","en":"MW","es":"MW","fr":"MW","pt":"MW","tr":"Megavat"},"type":"number","unit":"MW"}],"description":{"ar":"بيانات المشروع الواردة في المصدر الرسمي.","de":"Projektangabe aus der amtlichen Quelle.","en":"Project information stated in the official source.","es":"Dato del proyecto indicado en la fuente oficial.","fr":"Donnée du projet indiquée dans la source officielle.","pt":"Dado do projeto indicado na fonte oficial.","tr":"Resmî kaynakta açıklanan proje verisi."},"id":"release-statistic","methodology":{"ar":"نقلت القيمة كما وردت في القرار؛ ولا تعني إنجاز المشروع أو تشغيله.","de":"Wert aus der Quelle; er bedeutet weder Fertigstellung noch Inbetriebnahme.","en":"The source states 58.14 MW as the installation’s capacity; this is not additional capacity created by the modification.","es":"Valor transcrito de la fuente; no significa que el proyecto esté terminado o en servicio.","fr":"Valeur reprise de la source; elle ne signifie ni achèvement ni mise en service.","pt":"Valor transcrito da fonte; não significa conclusão ou entrada em serviço.","tr":"Kaynakta Baluma Solar tesisinin beyan edilen kurulu gücü 58,14 MW’tır; değişiklikle eklenen yeni güç değildir."},"rowTranslations":[{"indicator":{"ar":"القدرة المركبة الاسمية","de":"Installierte Nennleistung","en":"Kurulu güç","es":"Potencia instalada nominal","fr":"Puissance installée nominale","pt":"Potência instalada nominal","tr":"Kurulu güç"}}],"rows":[{"indicator":"Kurulu güç","value":58.14}],"sourceUrls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"],"title":{"ar":"المصدر والمقياس","de":"Quelle und Messgröße","en":"Source and measure","es":"Fuente y medida","fr":"Source et mesure","pt":"Fonte e medida","tr":"Veri kaynağı ve ölçüm"},"type":"table","updatedAt":"2026-10-20T22:33:06Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening/data/release-statistic?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening/data/release-statistic?lang=en&format=json"},"id":"release-statistic"}],"data_types":["table"],"editorial_illustration":null,"event_id":"event-a73d8554-3177-557f-9e5c-1ed77b768d68","event_period":"2026-09-21","event_period_basis":"event-or-reference-period","id":"baluma-solar-granada-modification-environmental-screening","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-20T23:01:22+00:00","publication_basis":"publication-record","published_at":"2026-10-20T23:01:22+00:00","reading_minutes":1,"region":"world","section_illustration":null,"slug":"baluma-solar-granada-modification-environmental-screening","sources":[{"checkedAt":"2026-10-21","name":"Boletín Oficial del Estado (BOE)","publishedAt":"2026-10-17","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662"}],"summary":"Spain’s environmental authority decided that modifications to the 58.14 MW Baluma Solar installation in Granada do not require a full environmental impact assessment. The decision appeared in the BOE on 17 October.","text":"Spain’s environmental authority decided that modifications to the 58.14 MW Baluma Solar installation in Granada do not require a full environmental impact assessment. The decision appeared in the BOE on 17 October.\n\nThe change includes burying part of the 220 kV evacuation line near the Cubillas River. The selected route is about 1,152 metres long.\n\nThe screening outcome depends on compliance with the original project conditions and additional safeguards; it does not announce new construction or commissioning.","title":"Baluma Solar modification screened out of full environmental assessment","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=en","language":"en","url":"https://newsverum.com/en/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=es","language":"es","url":"https://newsverum.com/es/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=de","language":"de","url":"https://newsverum.com/de/news/baluma-solar-granada-modification-environmental-screening"},{"api_url":"https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/baluma-solar-granada-modification-environmental-screening"}],"url":"https://newsverum.com/en/news/baluma-solar-granada-modification-environmental-screening"},"version":"1"}
