{"article":{"annotation":{"article_id":"auriginal-roger-project-gold-copper-drill-assays-october-2026","available_at":"2026-10-15T16:15:34.269103Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"117f8b05339ecde01bb776bbcf79230f6161240875bde80ace9893a26d2d57b1","input_sha256":"bcc3e94c8cb12e2b3b0781ea0274cf6c10a1caae631f8b3b20ee9841c3654473","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"CA","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.newsfilecorp.com/release/319019/Auriginal-Intersects-45.5-m-of-1.05-gt-Au-and-29.4-m-of-1.32-gt-Au-at-Roger-Extending-GoldCopper-Mineralization-at-Depth-Updated-Mineral-Resource-Estimate-Expected-Before-YearEnd-2026"]}],"geometry":null,"id":"iso3166-1:CA","kind":"country-or-area","labels":{"ar":"كندا","en":"Canada","es":"Canadá","fr":"Canada"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000349","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.newsfilecorp.com/release/319019/Auriginal-Intersects-45.5-m-of-1.05-gt-Au-and-29.4-m-of-1.32-gt-Au-at-Roger-Extending-GoldCopper-Mineralization-at-Depth-Updated-Mineral-Resource-Estimate-Expected-Before-YearEnd-2026"]}],"method":"controlled-rules-v1","rule_id":"business-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026?lang=en","category":"business","content":{"key_points":[],"paragraphs":["Auriginal Mining reported assays from four holes at its Roger project in Quebec’s Chibougamau district. Hole AUR-26-12 returned 45.5 metres grading 1.05 g/t gold from 397 metres down-hole, including 8.0 metres at 4.37 g/t and 2.2 metres at 12.2 g/t; the release also reported copper, silver and zinc in the narrower interval.","The company said the 2026 mineral-resource estimate expected before year-end will exclude this year’s drilling and reset the historical estimate using a revised interpretation and modern database. A later update incorporating 2026 drilling was targeted for the first half of 2027; reported down-hole lengths are not necessarily true widths, and the results do not establish added resources."],"sections":[]},"corrections":[],"country":"CA","data":{"blocks":[{"columns":[{"key":"figure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"metres"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"بيانات المشروع الواردة في البيان.","de":"Im Unternehmensbericht genannte Projektdaten.","en":"Project figures stated in the release.","es":"Datos del proyecto indicados en el comunicado.","fr":"Données du projet indiquées dans le communiqué.","pt":"Dados do projeto informados no comunicado.","tr":"Kaynak açıklamasında bildirilen proje verileri."},"id":"reported-figures-1","methodology":{"ar":"أرقام أوردتها الشركة، مع مراعاة حدود أخذ العينات والحفر والتخطيط المذكورة في المصدر.","de":"Vom Unternehmen gemeldete Werte; die in der Quelle genannten Grenzen der Probenahme, Bohrungen und Planung gelten.","en":"Company-reported figures; the sampling, drilling and planning limits stated in the source apply.","es":"Cifras comunicadas por la empresa, sujetas a los límites de muestreo, perforación y planificación indicados en la fuente.","fr":"Chiffres communiqués par la société, sous réserve des limites d’échantillonnage, de forage et de planification précisées dans la source.","pt":"Números divulgados pela empresa, sujeitos aos limites de amostragem, perfuração e planejamento descritos na fonte.","tr":"Şirket açıklamasındaki rakamlar; kaynakta belirtilen örnekleme, sondaj ve planlama sınırları geçerlidir."},"rowTranslations":[{"figure":{"ar":"نطاق الذهب في AUR-26-12","de":"Goldabschnitt AUR-26-12","en":"AUR-26-12 gold interval","es":"Intervalo de oro AUR-26-12","fr":"Intervalle aurifère AUR-26-12","pt":"Intervalo de ouro AUR-26-12","tr":"AUR-26-12 altın aralığı"},"unit":{"ar":"متر","de":"Meter","en":"metres","es":"metros","fr":"mètres","pt":"metros","tr":"metre"}},{"figure":{"ar":"نطاق الذهب في AUR-26-10","de":"Goldabschnitt AUR-26-10","en":"AUR-26-10 gold interval","es":"Intervalo de oro AUR-26-10","fr":"Intervalle aurifère AUR-26-10","pt":"Intervalo de ouro AUR-26-10","tr":"AUR-26-10 altın aralığı"},"unit":{"ar":"متر","de":"Meter","en":"metres","es":"metros","fr":"mètres","pt":"metros","tr":"metre"}},{"figure":{"ar":"الحفر التقريبي في المرحلة الثانية","de":"Ungefährer Bohrumfang Phase 2","en":"Approximate Phase 2 drilling","es":"Perforación aproximada de la fase 2","fr":"Forages approximatifs de la phase 2","pt":"Perfuração aproximada da fase 2","tr":"2. aşamada yaklaşık sondaj"},"unit":{"ar":"متر","de":"Meter","en":"metres","es":"metros","fr":"mètres","pt":"metros","tr":"metre"}}],"rows":[{"figure":"AUR-26-12 gold interval","unit":"metres","value":45.5},{"figure":"AUR-26-10 gold interval","unit":"metres","value":29.4},{"figure":"Approximate Phase 2 drilling","unit":"metres","value":5700}],"sourceUrls":["https://www.newsfilecorp.com/release/319019/Auriginal-Intersects-45.5-m-of-1.05-gt-Au-and-29.4-m-of-1.32-gt-Au-at-Roger-Extending-GoldCopper-Mineralization-at-Depth-Updated-Mineral-Resource-Estimate-Expected-Before-YearEnd-2026"],"title":{"ar":"الأرقام المعلنة","de":"Gemeldete Werte","en":"Reported figures","es":"Cifras comunicadas","fr":"Chiffres communiqués","pt":"Números divulgados","tr":"Ölçülen değerler"},"type":"table","updatedAt":"2026-10-15T16:00:18Z"},{"columns":[{"key":"figure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"g/t"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"بيانات المشروع الواردة في البيان.","de":"Im Unternehmensbericht genannte Projektdaten.","en":"Project figures stated in the release.","es":"Datos del proyecto indicados en el comunicado.","fr":"Données du projet indiquées dans le communiqué.","pt":"Dados do projeto informados no comunicado.","tr":"Kaynak açıklamasında bildirilen proje verileri."},"id":"reported-figures-2","methodology":{"ar":"أرقام أوردتها الشركة، مع مراعاة حدود أخذ العينات والحفر والتخطيط المذكورة في المصدر.","de":"Vom Unternehmen gemeldete Werte; die in der Quelle genannten Grenzen der Probenahme, Bohrungen und Planung gelten.","en":"Company-reported figures; the sampling, drilling and planning limits stated in the source apply.","es":"Cifras comunicadas por la empresa, sujetas a los límites de muestreo, perforación y planificación indicados en la fuente.","fr":"Chiffres communiqués par la société, sous réserve des limites d’échantillonnage, de forage et de planification précisées dans la source.","pt":"Números divulgados pela empresa, sujeitos aos limites de amostragem, perfuração e planejamento descritos na fonte.","tr":"Şirket açıklamasındaki rakamlar; kaynakta belirtilen örnekleme, sondaj ve planlama sınırları geçerlidir."},"rowTranslations":[{"figure":{"ar":"درجة الذهب في AUR-26-12","de":"Goldgehalt AUR-26-12","en":"AUR-26-12 gold grade","es":"Ley de oro AUR-26-12","fr":"Teneur en or AUR-26-12","pt":"Teor de ouro AUR-26-12","tr":"AUR-26-12 altın tenörü"},"unit":{"ar":"غ/طن","de":"g/t","en":"g/t","es":"g/t","fr":"g/t","pt":"g/t","tr":"g/t"}},{"figure":{"ar":"درجة الذهب في AUR-26-10","de":"Goldgehalt AUR-26-10","en":"AUR-26-10 gold grade","es":"Ley de oro AUR-26-10","fr":"Teneur en or AUR-26-10","pt":"Teor de ouro AUR-26-10","tr":"AUR-26-10 altın tenörü"},"unit":{"ar":"غ/طن","de":"g/t","en":"g/t","es":"g/t","fr":"g/t","pt":"g/t","tr":"g/t"}}],"rows":[{"figure":"AUR-26-12 gold grade","unit":"g/t","value":1.05},{"figure":"AUR-26-10 gold grade","unit":"g/t","value":1.32}],"sourceUrls":["https://www.newsfilecorp.com/release/319019/Auriginal-Intersects-45.5-m-of-1.05-gt-Au-and-29.4-m-of-1.32-gt-Au-at-Roger-Extending-GoldCopper-Mineralization-at-Depth-Updated-Mineral-Resource-Estimate-Expected-Before-YearEnd-2026"],"title":{"ar":"الأرقام المعلنة","de":"Gemeldete Werte","en":"Reported figures","es":"Cifras comunicadas","fr":"Chiffres communiqués","pt":"Números divulgados","tr":"Ölçülen değerler"},"type":"table","updatedAt":"2026-10-15T16:00:18Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026/data/reported-figures-1?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026/data/reported-figures-1?lang=en&format=json"},"id":"reported-figures-1"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026/data/reported-figures-2?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026/data/reported-figures-2?lang=en&format=json"},"id":"reported-figures-2"}],"data_types":["table"],"editorial_illustration":{"alt":"Conceptual illustration of industry, engineering and logistics connections.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"event_id":"event-e6ff9383-1641-50f5-9dfd-40098bd911ca","event_period":"2026-10-15","event_period_basis":"event-or-reference-period","id":"auriginal-roger-project-gold-copper-drill-assays-october-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-15T16:15:27+00:00","publication_basis":"publication-record","published_at":"2026-10-15T16:15:27+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Conceptual illustration of industry, engineering and logistics connections.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"slug":"auriginal-roger-project-gold-copper-drill-assays-october-2026","sources":[{"checkedAt":"2026-10-15","name":"Auriginal Mining Corp. (Newsfile)","publishedAt":"2026-10-15","url":"https://www.newsfilecorp.com/release/319019/Auriginal-Intersects-45.5-m-of-1.05-gt-Au-and-29.4-m-of-1.32-gt-Au-at-Roger-Extending-GoldCopper-Mineralization-at-Depth-Updated-Mineral-Resource-Estimate-Expected-Before-YearEnd-2026"}],"summary":"Four holes returned gold-copper assays; the 2026 estimate will exclude this year’s drilling.","text":"Four holes returned gold-copper assays; the 2026 estimate will exclude this year’s drilling.\n\nAuriginal Mining reported assays from four holes at its Roger project in Quebec’s Chibougamau district. Hole AUR-26-12 returned 45.5 metres grading 1.05 g/t gold from 397 metres down-hole, including 8.0 metres at 4.37 g/t and 2.2 metres at 12.2 g/t; the release also reported copper, silver and zinc in the narrower interval.\n\nThe company said the 2026 mineral-resource estimate expected before year-end will exclude this year’s drilling and reset the historical estimate using a revised interpretation and modern database. A later update incorporating 2026 drilling was targeted for the first half of 2027; reported down-hole lengths are not necessarily true widths, and the results do not establish added resources.","title":"Auriginal reports further gold-copper assays at Roger","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/auriginal-roger-project-gold-copper-drill-assays-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/auriginal-roger-project-gold-copper-drill-assays-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/auriginal-roger-project-gold-copper-drill-assays-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/auriginal-roger-project-gold-copper-drill-assays-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/auriginal-roger-project-gold-copper-drill-assays-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/auriginal-roger-project-gold-copper-drill-assays-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/auriginal-roger-project-gold-copper-drill-assays-october-2026"}],"url":"https://newsverum.com/en/news/auriginal-roger-project-gold-copper-drill-assays-october-2026"},"version":"1"}
