{"article":{"annotation":{"article_id":"andrada-mining-first-half-revenue-and-tin-output-rise","available_at":"2026-10-21T11:11:55.980297Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"9ea6f1e6d43aedc567f9a08298f1a23ffb3c268ef7e196712e88642a6a5165fe","input_sha256":"81128781813054f4ac5f3ec24824063777073dfe9fe8ffc6a7fed48a9e970e15","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"NA","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.investegate.co.uk/announcement/rns/andrada-mining-limited-npv--atm/interim-results-for-six-months-ended-31-aug-2026/9832839"]}],"geometry":null,"id":"iso3166-1:NA","kind":"country-or-area","labels":{"ar":"ناميبيا","en":"Namibia","es":"Namibia","fr":"Namibie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000349","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.investegate.co.uk/announcement/rns/andrada-mining-limited-npv--atm/interim-results-for-six-months-ended-31-aug-2026/9832839"]}],"method":"controlled-rules-v1","rule_id":"business-broad","status":"candidate"},{"concept_id":"medtop:20000178","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: reports higher first-half revenue","source_urls":["https://www.investegate.co.uk/announcement/rns/andrada-mining-limited-npv--atm/interim-results-for-six-months-ended-31-aug-2026/9832839"]}],"method":"controlled-rules-v1","rule_id":"corporate-results","status":"candidate"},{"concept_id":"medtop:20000316","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: Mining","source_urls":["https://www.investegate.co.uk/announcement/rns/andrada-mining-limited-npv--atm/interim-results-for-six-months-ended-31-aug-2026/9832839"]}],"method":"controlled-rules-v1","rule_id":"mining","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise?lang=en","category":"business","content":{"key_points":[],"paragraphs":["Andrada Mining published unaudited interim results on 21 October for the six months ended 31 August 2026. Group revenue was £20.575 million and contained tin production was 576 tonnes, compared with £11.440 million and 511 tonnes respectively in the corresponding 2025 period.","Gross profit reached £8.302 million and profit after tax was £2.524 million, versus a £3.009 million after-tax loss a year earlier. The company said its ore-sorting investment at Uis remained on schedule. These are group-wide results, and the interim financial information is unaudited."],"sections":[]},"corrections":[],"country":"NA","data":{"blocks":[{"columns":[{"key":"period","label":{"ar":"الفترة","de":"Zeitraum","en":"Period","es":"Periodo","fr":"Période","pt":"Período","tr":"Dönem"},"type":"text"},{"key":"revenue","label":{"ar":"إيرادات المجموعة","de":"Konzernumsatz","en":"Group revenue","es":"Ingresos del grupo","fr":"Chiffre d’affaires du groupe","pt":"Receita do grupo","tr":"Grup geliri"},"type":"number","unit":"million GBP"},{"key":"contained_tin","label":{"ar":"إنتاج القصدير المحتوى","de":"Produktion enthaltenen Zinns","en":"Contained tin production","es":"Producción de estaño contenido","fr":"Production d’étain contenu","pt":"Produção de estanho contido","tr":"İçerilen kalay üretimi"},"type":"number","unit":"tonnes"},{"key":"gross_profit","label":{"ar":"إجمالي الربح","de":"Bruttogewinn","en":"Gross profit","es":"Beneficio bruto","fr":"Bénéfice brut","pt":"Lucro bruto","tr":"Brüt kâr"},"type":"number","unit":"million GBP"}],"description":{"ar":"الأرقام التي أبلغت عنها الشركة لفترتي الستة أشهر المنتهيتين في 31 أغسطس 2026 و31 أغسطس 2025.","de":"Unternehmensangaben für die Halbjahre zum 31. August 2026 und 31. August 2025.","en":"Company-reported figures for the six-month periods ended 31 August 2026 and 31 August 2025.","es":"Cifras comunicadas por la empresa para los semestres terminados el 31 de agosto de 2026 y 2025.","fr":"Chiffres publiés par la société pour les semestres clos les 31 août 2026 et 31 août 2025.","pt":"Valores divulgados pela empresa para os semestres encerrados em 31 de agosto de 2026 e 31 de agosto de 2025.","tr":"31 Ağustos 2026 ve 31 Ağustos 2025 tarihlerinde sona eren altışar aylık dönemlerin şirket raporundaki ölçümleri."},"id":"andrada-half-year-results","methodology":{"ar":"إيرادات المجموعة وإجمالي الربح من البيانات المالية المرحلية غير المدققة، وإنتاج القصدير المحتوى من التقرير التشغيلي.","de":"Konzernumsatz und Bruttogewinn aus ungeprüften Zwischenabschlüssen sowie Produktion enthaltenen Zinns aus dem Betriebsbericht.","en":"Group revenue and gross profit from unaudited interim financial statements and contained tin output from the operating report.","es":"Ingresos y beneficio bruto de los estados financieros intermedios no auditados, y producción de estaño contenido del informe operativo.","fr":"Chiffre d’affaires et bénéfice brut des états financiers intermédiaires non audités, production d’étain contenu du rapport opérationnel.","pt":"Receita e lucro bruto das demonstrações intercalares não auditadas e produção de estanho contido do relatório operacional.","tr":"Şirketin denetlenmemiş ara dönem finansal tablolarındaki Grup gelir ve brüt kârı ile operasyonel rapordaki içerilen kalay üretimi."},"rowTranslations":[{"period":{"ar":"النصف الأول من السنة المالية 2027","de":"1. Halbjahr des Geschäftsjahres 2027","en":"H1 FY2027","es":"1.er semestre del ejercicio 2027","fr":"1er semestre de l’exercice 2027","pt":"1.º semestre do exercício de 2027","tr":"2027 mali yılı ilk yarısı"}},{"period":{"ar":"النصف الأول من السنة المالية 2026","de":"1. Halbjahr des Geschäftsjahres 2026","en":"H1 FY2026","es":"1.er semestre del ejercicio 2026","fr":"1er semestre de l’exercice 2026","pt":"1.º semestre do exercício de 2026","tr":"2026 mali yılı ilk yarısı"}}],"rows":[{"contained_tin":576,"gross_profit":8.302,"period":"H1 FY2027","revenue":20.575},{"contained_tin":511,"gross_profit":1.875,"period":"H1 FY2026","revenue":11.44}],"sourceUrls":["https://www.investegate.co.uk/announcement/rns/andrada-mining-limited-npv--atm/interim-results-for-six-months-ended-31-aug-2026/9832839"],"title":{"ar":"إيرادات المجموعة وإنتاج القصدير في أويس خلال ستة أشهر","de":"Sechsmonatiger Konzernumsatz und Zinnproduktion in Uis","en":"Six-month group revenue and Uis tin production","es":"Ingresos del grupo y producción de estaño en Uis durante seis meses","fr":"Revenus du groupe et production d’étain à Uis sur six mois","pt":"Receita do grupo e produção de estanho em Uis em seis meses","tr":"Altı aylık Grup geliri ve Uis kalay üretimi"},"type":"table","updatedAt":"2026-10-21T11:02:50Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise/data/andrada-half-year-results?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise/data/andrada-half-year-results?lang=en&format=json"},"id":"andrada-half-year-results"}],"data_types":["table"],"editorial_illustration":{"alt":"Conceptual illustration of industry, engineering and logistics connections.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"event_id":"event-44c17e38-b3a7-5c23-8211-a999f0856e79","event_period":"2026-08","event_period_basis":"source-review","id":"andrada-mining-first-half-revenue-and-tin-output-rise","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-21T11:11:48+00:00","publication_basis":"publication-record","published_at":"2026-10-21T11:11:48+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Conceptual illustration of industry, engineering and logistics connections.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"slug":"andrada-mining-first-half-revenue-and-tin-output-rise","sources":[{"checkedAt":"2026-10-21","name":"Andrada Mining Limited (RNS via Investegate)","publishedAt":"2026-10-21","url":"https://www.investegate.co.uk/announcement/rns/andrada-mining-limited-npv--atm/interim-results-for-six-months-ended-31-aug-2026/9832839"}],"summary":"Andrada Mining, which operates the Uis mine in Namibia, said revenue rose 80% to £20.6 million and contained tin production increased 13% to 576 tonnes in the six months to 31 August.","text":"Andrada Mining, which operates the Uis mine in Namibia, said revenue rose 80% to £20.6 million and contained tin production increased 13% to 576 tonnes in the six months to 31 August.\n\nAndrada Mining published unaudited interim results on 21 October for the six months ended 31 August 2026. Group revenue was £20.575 million and contained tin production was 576 tonnes, compared with £11.440 million and 511 tonnes respectively in the corresponding 2025 period.\n\nGross profit reached £8.302 million and profit after tax was £2.524 million, versus a £3.009 million after-tax loss a year earlier. The company said its ore-sorting investment at Uis remained on schedule. These are group-wide results, and the interim financial information is unaudited.","title":"Andrada reports higher first-half revenue and tin output","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/andrada-mining-first-half-revenue-and-tin-output-rise"},{"api_url":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise?lang=en","language":"en","url":"https://newsverum.com/en/news/andrada-mining-first-half-revenue-and-tin-output-rise"},{"api_url":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/andrada-mining-first-half-revenue-and-tin-output-rise"},{"api_url":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/andrada-mining-first-half-revenue-and-tin-output-rise"},{"api_url":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise?lang=es","language":"es","url":"https://newsverum.com/es/news/andrada-mining-first-half-revenue-and-tin-output-rise"},{"api_url":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise?lang=de","language":"de","url":"https://newsverum.com/de/news/andrada-mining-first-half-revenue-and-tin-output-rise"},{"api_url":"https://newsverum.com/api/v1/articles/andrada-mining-first-half-revenue-and-tin-output-rise?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/andrada-mining-first-half-revenue-and-tin-output-rise"}],"url":"https://newsverum.com/en/news/andrada-mining-first-half-revenue-and-tin-output-rise"},"version":"1"}
