{"article":{"annotation":{"article_id":"al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026","available_at":"2026-10-06T23:11:46.781027Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"d9156ac4019b710465c41e493cfdab4822ad4bd0653edcbb1652b0c8ec0077d1","input_sha256":"a6c8c48dc515392687cf7425c0a1924a8d843c91e318e4e55e2417857500ae1c","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"SA","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.saudiexchange.sa/wps/portal/saudiexchange/newsandreports/issuer-news/issuer-announcements/issuer-announcements-details/?anId=98148&anCat=1&cs=4020&locale=en"]}],"geometry":null,"id":"iso3166-1:SA","kind":"country-or-area","labels":{"ar":"المملكة العربية السعودية","en":"Saudi Arabia","es":"Arabia Saudita","fr":"Arabie saoudite"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"d28c9c89703b56bd91fd887965d416d0115c2473d4bfbd3e558bcceafc3941dd","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.saudiexchange.sa/wps/portal/saudiexchange/newsandreports/issuer-news/issuer-announcements/issuer-announcements-details/?anId=98148&anCat=1&cs=4020&locale=en"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026?lang=fr","category":"infrastructure","content":{"key_points":[],"paragraphs":["Saudi Real Estate Company (Al Akaria) a annoncé le 15 septembre 2026 avoir signé le contrat du lot n° 1 du projet à usage mixte Porta Jeddah avec Mounes Mohamed Alshayeb for Civil Construction (MOBCO). La valeur est de 463 132 910 riyals saoudiens, hors TVA, soit le montant auquel la société avait annoncé l’attribution le 12 mai 2026.","Le lot n° 1 couvre les travaux de structure de tous les composants du projet, hôtel compris, les façades extérieures, les travaux électromécaniques de tous les composants sauf l’hôtel, et les espaces publics paysagers. Le contrat dure 820 jours calendaires. Porta Jeddah se situe dans le quartier d’Al Nahdah, sur la route du Roi Abdulaziz, à Djeddah, sur un terrain de 47 971 mètres carrés, avec une surface de plancher brute totale d’environ 133 000 mètres carrés. Le projet comprend un hôtel, des suites hôtelières, des bureaux, une promenade commerciale avec boutiques, restaurants et cafés, ainsi que des installations de loisirs et des espaces publics.","Al Akaria a indiqué que l’impact financier devrait apparaître dans ses états financiers à partir du quatrième trimestre 2026 et qu’aucune partie liée n’est concernée. Elle a décrit Porta Jeddah comme son premier projet distinctif à Djeddah."],"sections":[]},"corrections":[{"at":"2026-10-07T00:51:50+03:00","language":"fr","text":"Des éditions allemande et portugaise, ainsi que les traductions des explications des données et des corrections, ont été ajoutées à cet article."}],"country":"SA","data":{"blocks":[{"description":{"ar":"قيمة العقد ومدته وأرقام الموقع كما وردت في إعلان العقارية على السوق المالية السعودية (تداول) بتاريخ 15 سبتمبر 2026.","de":"Vertragswert, Laufzeit und Standortangaben laut Mitteilung von Al Akaria an der Saudi Exchange vom 15. September 2026.","en":"Contract value, duration and site figures stated in Al Akaria’s Saudi Exchange announcement of 15 September 2026.","es":"Valor del contrato, plazo y cifras del emplazamiento indicados en el anuncio de Al Akaria a la Bolsa saudí (Saudi Exchange) del 15 de septiembre de 2026.","fr":"Valeur du contrat, durée et chiffres du site indiqués dans l’annonce d’Al Akaria à la Bourse saoudienne (Saudi Exchange) du 15 septembre 2026.","pt":"Valor do contrato, duração e dados do local informados no comunicado da Al Akaria à Saudi Exchange em 15 de setembro de 2026.","tr":"Al Akaria’nın 15 Eylül 2026 tarihli Saudi Exchange duyurusunda belirtilen sözleşme bedeli, süre ve saha rakamları."},"id":"contract-figures","items":[{"basis":"observed","label":{"ar":"قيمة عقد الحزمة الأولى (غير شاملة ضريبة القيمة المضافة)","de":"Vertragswert für Paket Eins ohne Mehrwertsteuer","en":"Package One contract value, excluding VAT","es":"Valor del contrato del paquete uno, sin IVA","fr":"Valeur du contrat du lot n° 1, hors TVA","pt":"Valor do contrato do Pacote Um, sem IVA","tr":"Birinci Paket sözleşme bedeli (KDV hariç)"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"jeddah","id":"porta-jeddah-package-one-contract-value","periodRole":"announcement-date","unitCode":"sar"},"period":"2026-09-15","unit":"SAR","value":463132910},{"basis":"observed","label":{"ar":"مدة العقد","de":"Vertragslaufzeit","en":"Contract duration","es":"Duración del contrato","fr":"Durée du contrat","pt":"Duração do contrato","tr":"Sözleşme süresi"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"jeddah","id":"porta-jeddah-package-one-contract-duration","periodRole":"announcement-date","unitCode":"day"},"period":"2026-09-15","unit":"calendar days","value":820},{"basis":"observed","label":{"ar":"مساحة أرض المشروع","de":"Projektgrundstücksfläche","en":"Project land area","es":"Superficie del terreno del proyecto","fr":"Superficie du terrain du projet","pt":"Área do terreno do projeto","tr":"Proje arazisinin alanı"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"jeddah","id":"porta-jeddah-package-one-project-land-area","periodRole":"announcement-date","unitCode":"square-metre"},"period":"2026-09-15","unit":"square metres","value":47971},{"basis":"target","label":{"ar":"مساحة البناء الإجمالية","de":"Gesamte Bruttogeschossfläche","en":"Total gross floor area","es":"Superficie bruta construida total","fr":"Surface de plancher brute totale","pt":"Área bruta total construída","tr":"Toplam brüt inşaat alanı"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"jeddah","id":"porta-jeddah-package-one-total-gross-floor-area","periodRole":"announcement-date","unitCode":"square-metre"},"period":"2026-09-15","unit":"square metres","value":133000,"valueQualifier":"approximate"}],"methodology":{"ar":"القيمة هي المبلغ الذي أعلنته الشركة للحزمة الأولى وحدها دون ضريبة القيمة المضافة، وهو المبلغ نفسه الذي أُعلن عند الترسية في 12 مايو 2026. والمدة بالأيام التقويمية. أما مساحة الأرض ومساحة البناء الإجمالية فتخصان مشروع بورتا جدة بكامله لا الحزمة الأولى وحدها، ومساحة البناء تقريبية.","de":"Der Wert ist der vom Unternehmen nur für Paket 1 angegebene Betrag ohne Mehrwertsteuer; derselbe Betrag wurde bei der Vergabe am 12. Mai 2026 genannt. Die Laufzeit wird in Kalendertagen angegeben. Grundstücksfläche und Geschossfläche beziehen sich auf das gesamte Projekt Porta Jeddah, nicht nur auf Paket 1; die Geschossfläche ist ein Näherungswert.","en":"The value is the amount the company stated for Package One only, excluding VAT; the same value was announced at award on 12 May 2026. Duration is in calendar days. Land area and gross floor area describe the whole Porta Jeddah project, not Package One alone, and the floor area is approximate.","es":"El valor es el importe indicado por la empresa solo para el paquete uno, sin IVA; el mismo valor se anunció en la adjudicación del 12 de mayo de 2026. La duración se expresa en días naturales. La superficie del terreno y la superficie bruta construida describen todo el proyecto Porta Jeddah, no solo el paquete uno, y la superficie construida es aproximada.","fr":"La valeur est le montant indiqué par la société pour le seul lot n° 1, hors TVA ; la même valeur avait été annoncée lors de l’attribution, le 12 mai 2026. La durée est en jours calendaires. La superficie du terrain et la surface de plancher brute concernent l’ensemble du projet Porta Jeddah, et non le seul lot n° 1, et la surface de plancher est approximative.","pt":"O valor é o montante informado pela empresa somente para o Pacote Um, sem IVA; o mesmo valor foi anunciado na contratação em 12 de maio de 2026. A duração está em dias corridos. As áreas do terreno e da construção referem-se a todo o projeto Porta Jeddah, e não apenas ao Pacote Um; a área construída é aproximada.","tr":"Tutar, şirketin yalnızca Birinci Paket için açıkladığı KDV hariç bedeldir; aynı tutar 12 Mayıs 2026’daki ihale duyurusunda da verilmişti. Süre takvim günüdür. Arazi ve brüt inşaat alanı yalnızca Birinci Paketi değil, Porta Jeddah projesinin tamamını tanımlar; inşaat alanı yaklaşık bir değerdir."},"sourceUrls":["https://www.saudiexchange.sa/wps/portal/saudiexchange/newsandreports/issuer-news/issuer-announcements/issuer-announcements-details/?anId=98148&anCat=1&cs=4020&locale=en"],"title":{"ar":"أرقام العقد والموقع","de":"Vertrags- und Standortangaben","en":"Contract and site figures","es":"Cifras del contrato y del emplazamiento","fr":"Chiffres du contrat et du site","pt":"Valores do contrato e do local","tr":"Sözleşme ve saha rakamları"},"type":"metrics","updatedAt":"2026-10-07T00:51:50+03:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026/data/contract-figures?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026/data/contract-figures?lang=fr&format=json"},"id":"contract-figures"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-d5880633-f241-5a03-a107-259496550247","event_period":"2026-09-15","event_period_basis":"event-or-reference-period","id":"al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026","image":null,"importance":0.6,"language":"fr","modified_at":"2026-10-07T00:51:50+03:00","publication_basis":"publication-record","published_at":"2026-10-05T09:37:37+00:00","reading_minutes":2,"region":"world","section_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026","sources":[{"checkedAt":"2026-10-04","name":"Saudi Real Estate Company (Al Akaria) via Saudi Exchange","publishedAt":"2026-09-15","url":"https://www.saudiexchange.sa/wps/portal/saudiexchange/newsandreports/issuer-news/issuer-announcements/issuer-announcements-details/?anId=98148&anCat=1&cs=4020&locale=en"}],"summary":"Saudi Real Estate Company (Al Akaria) a signé le 15 septembre 2026 avec MOBCO un contrat de 463 132 910 riyals saoudiens, hors TVA, pour le lot n° 1 du projet mixte Porta Jeddah, à Djeddah, d’une durée de 820 jours calendaires.","text":"Saudi Real Estate Company (Al Akaria) a signé le 15 septembre 2026 avec MOBCO un contrat de 463 132 910 riyals saoudiens, hors TVA, pour le lot n° 1 du projet mixte Porta Jeddah, à Djeddah, d’une durée de 820 jours calendaires.\n\nSaudi Real Estate Company (Al Akaria) a annoncé le 15 septembre 2026 avoir signé le contrat du lot n° 1 du projet à usage mixte Porta Jeddah avec Mounes Mohamed Alshayeb for Civil Construction (MOBCO). La valeur est de 463 132 910 riyals saoudiens, hors TVA, soit le montant auquel la société avait annoncé l’attribution le 12 mai 2026.\n\nLe lot n° 1 couvre les travaux de structure de tous les composants du projet, hôtel compris, les façades extérieures, les travaux électromécaniques de tous les composants sauf l’hôtel, et les espaces publics paysagers. Le contrat dure 820 jours calendaires. Porta Jeddah se situe dans le quartier d’Al Nahdah, sur la route du Roi Abdulaziz, à Djeddah, sur un terrain de 47 971 mètres carrés, avec une surface de plancher brute totale d’environ 133 000 mètres carrés. Le projet comprend un hôtel, des suites hôtelières, des bureaux, une promenade commerciale avec boutiques, restaurants et cafés, ainsi que des installations de loisirs et des espaces publics.\n\nAl Akaria a indiqué que l’impact financier devrait apparaître dans ses états financiers à partir du quatrième trimestre 2026 et qu’aucune partie liée n’est concernée. Elle a décrit Porta Jeddah comme son premier projet distinctif à Djeddah.\n\nDes éditions allemande et portugaise, ainsi que les traductions des explications des données et des corrections, ont été ajoutées à cet article.","title":"Al Akaria signe avec MOBCO le lot n° 1 du projet mixte Porta Jeddah","topics":["epc-contractors"],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026"}],"url":"https://newsverum.com/fr/news/al-akaria-mobco-porta-jeddah-package-one-construction-contract-september-2026"},"version":"1"}
