{"article":{"annotation":{"article_id":"aker-tussa-ii-hidroelektrik-ekipmanlari-2026","available_at":"2026-10-11T21:35:08.288122Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"28a83d017ea3b1ba14abccddb93e373d4a542ecb49964087d5f628eec34a1aad","input_sha256":"70266f63deb91852b142c48784639c4090288ba377ccd52cbc0082d3cf96efc9","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000257","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: hydropower","source_urls":["https://www.akersolutions.com/news/news-archive/2026/aker-solutions-secures-contract-with-tussa-energi-for-tussa-ii-hydropower-plant/"]}],"method":"controlled-rules-v1","rule_id":"renewables","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["Aker Solutions’ June 29 release reports Tussa Energi’s electromechanical equipment award for Norway’s Tussa II plant. Two 75 MW Pelton units are planned.","This is equipment delivery; it does not assign all civil construction to the same company. Technical assessment should coordinate acceptance tests for turbines, generators and grid connection. Planned installed capacity is a different measure from achieved annual electricity production."],"sections":[]},"corrections":[{"at":"2026-10-06T21:56:59+03:00","language":"en","text":"The missing language translations for this article have been added."},{"at":"2026-10-07T00:51:49+03:00","language":"en","text":"German and Portuguese editions and translations of the data and correction explanations have been added to this article."}],"country":null,"data":null,"data_downloads":[],"data_types":[],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-1b83d514-df90-5f9b-a461-a47785e76442","event_period":"2026-06-29","event_period_basis":"event-or-reference-period","id":"aker-tussa-ii-hidroelektrik-ekipmanlari-2026","image":null,"importance":0.4,"language":"en","modified_at":"2026-10-07T00:51:49+03:00","publication_basis":"publication-record","published_at":"2026-10-02T21:09:51+03:00","reading_minutes":1,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii","sources":[{"checkedAt":"2026-10-02","name":"Aker Solutions","publishedAt":"2026-06-29","url":"https://www.akersolutions.com/news/news-archive/2026/aker-solutions-secures-contract-with-tussa-energi-for-tussa-ii-hydropower-plant/"}],"summary":"The Norwegian hydropower investment announces equipment scope.","text":"The Norwegian hydropower investment announces equipment scope.\n\nAker Solutions’ June 29 release reports Tussa Energi’s electromechanical equipment award for Norway’s Tussa II plant. Two 75 MW Pelton units are planned.\n\nThis is equipment delivery; it does not assign all civil construction to the same company. Technical assessment should coordinate acceptance tests for turbines, generators and grid connection. Planned installed capacity is a different measure from achieved annual electricity production.\n\nThe missing language translations for this article have been added.\n\nGerman and Portuguese editions and translations of the data and correction explanations have been added to this article.","title":"Aker Solutions supplies electromechanical equipment for 150 MW Tussa II","topics":["epc-contractors"],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii"},{"api_url":"https://newsverum.com/api/v1/articles/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii?lang=en","language":"en","url":"https://newsverum.com/en/news/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii"},{"api_url":"https://newsverum.com/api/v1/articles/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii"},{"api_url":"https://newsverum.com/api/v1/articles/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii"},{"api_url":"https://newsverum.com/api/v1/articles/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii?lang=es","language":"es","url":"https://newsverum.com/es/news/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii"},{"api_url":"https://newsverum.com/api/v1/articles/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii?lang=de","language":"de","url":"https://newsverum.com/de/news/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii"},{"api_url":"https://newsverum.com/api/v1/articles/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii"}],"url":"https://newsverum.com/en/news/aker-solutions-supplies-electromechanical-equipment-for-150-mw-tussa-ii"},"version":"1"}
